Marine Technologies, LLC

Bridge Mate DP 3

A DP 3 system has an extended hardware configuration compared to a DP 2 system. The triple redundant DP controller is still used and a minimum of three operator stations is required. There will also be three I/O units to interface components, as opposed to a double set of sensors typically used in a DP 2 configuration. A DP 3 system also needs a physically separate, fire-safe compartment where one control computer, one operator station and one sensor I/O unit have to be located in order to comply with Class 3 requirements. A typical DP 3 configuration is illustrated below.

Bridge Mate DP 3 System

Download the Brochures

Click on a link below to download the brochure as a PDF.

Return to Dynamic Positioning

Upcoming Exhibitions

Offshore Technology Conference … May 1-4, 2017 … Houston, TX … Booth 972

Nor-Shipping … May 30 - June 2, 2017 … Oslo, Norway … Stand B03-12